The work to be performed consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the plans, specifications, and contract documents.

The project is an improvement to an existing senior center. The current senior center is to remain fully operational during construction. The work includes the following:

  1. Demolition, removal, and disposal of the existing accessible ramp.

  2. Remove and dispose of existing planters.

  3. Install a new concrete sidewalk ramp according to ADA.

Submission should be addressed to City Clerk, 383 Main Street, Brawley, CA 92227.

The work to be performed consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the plans, specifications, and contract documents. The project is an improvement to an existing park. The existing park is to remain fully operational during construction.

The work includes the following:

  1. New commercial playground area.

  2. New concrete ADA sidewalk from the playground area to the southwest side of an existing sidewalk around an existing basketball court

Submission should be addressed to Public Works Department, 180 South Western Avenue, Brawley, CA 92227.

The Work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The Main Street Water Pipeline and Paving Improvement Project includes the replacement of existing water pipelines along Main Street from Highway 86/First Street to Eastern Avenue. Existing 6-inch and 8-inch cast iron water pipelines along Main Street are to be replaced with a new parallel 12-inch AWWA C-900, DR18 PVC water pipeline; except at the intersection of Highway 86/First Street and Main Street. At the Highway 86/First Street and Main Street intersection existing 12-inch and 16-inch cast iron water pipelines are to be replaced with new 12-inch and 16-inch AWWA C-900, DR18 and AWWA C-905, DR18 PVC pipelines.

It is intended that the work be completed in every respect under the Contract, and such items or details not mentioned above that are required by the Plans, Specifications, and Contract documents shall be furnished, performed, placed, constructed, or installed by the Contractor.